Pindula|
HomeGeneral

ZESA Says Load Shedding Hampering Restoration Of Faults

Share on FacebookShare on TwitterShare on LinkedIn
ZESA Says Load Shedding Hampering Restoration Of Faults

The Zimbabwe Electricity Transmission and Distribution Company (ZETDC) has blamed the ongoing load shedding for its failure to restore or correct faults for consumers.

In a statement, ZETDC said:

Kindly note that In load shaded areas, the restoration of faults is being hampered by the unavailability of power for testing for restoration. They are thus taking longer than is usually the case.

 

Tags

Comments

Leave a Comment


Buy Phones on Credit.

More Deals
Feedback