Stanley Kazhenje

Revision as of 12:18, 28 August 2019 by Michaellaban (talk | contribs) (Created page with "==Personal Details== No information could be found on his age, place of birth, or family. ==School / Education== 1963 – 1971: St Augustine’s, Penhalonga. A level 1974...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Personal Details

No information could be found on his age, place of birth, or family.

School / Education

1963 – 1971: St Augustine’s, Penhalonga. A level 1974 – 1977: B. Sc., Electronics & Electrical Engineering, University of Birmingham. 1978 – 1980: Master's degree, Control Engineering, Linear & Non-Linear Systems, University of Coventry. [1]

Service / Career

1980 – 1993: General Works Manager, Ziscosteel.
1993 – Present: MD, Terminal Engineers.
2011 – Present: Senior Electrical and Control Engineer, Lamont Consulting / Nicholas O’Dwyer Consulting / Terminal Engineers.
2014 – present: Board Chairman, Zimbabwe Power Company (ZPC)
2014 – present: Non-executive Director, ZESA Holdings
[1]

Events

In April 2019, Stanley Kazhanje faced allegations of receiving a $10 000 bribe from Intratrek Zimbabwe not to cancel the 100 megawatt project, the $200 million Gwanda Solar Project tender awarded to the Wicknell Chivayo-led firm The State alleges that on January 21, 2016, and under unclear circumstances, Kazhanje received $10 000 into his Barclays Bank personal account from Intratrek’s CBZ Bank account. Later, he presided over a meeting in which the board decided against terminating the Intratrek contract despite the company having failed to meet its obligations under the contract. This resulted in ZPC paying Intratrek $4 387 849 in advance. [2]


Further Reading

  1. 1.0 1.1 [1], Stanley Kazhenje, Linked In, Retrieved: 27 August 2019
  2. [2], 'Newsday, Published: 5 April 2019, Retrieved: 27 August 2019