Difference between revisions of "Zimbabwe Power Company"

Line 37: Line 37:
 
 
 
{| class="wikitable"
 
{| class="wikitable"
|-
+
 
! Header text !! Header text !! Header text !! Header text
+
| Station || Design Capacity || Production March 2018 || Production June 2019
|-
 
| Example || Design Capacity || Production March 2018 || Production June 2019
 
 
|-
 
|-
 
| [[Munyati Thermal Power Station]] || 120MW || 0MW || 17MW
 
| [[Munyati Thermal Power Station]] || 120MW || 0MW || 17MW

Revision as of 10:24, 1 August 2019

Zimbabwe Power Company
Type
Parastatal
IndustryEnergy
PredecessorZimbabwe Electricity Supply Authority Holdings (ZESA)
Founded1996
FounderGovernment of Zimbabwe
HeadquartersHarare, Zimbabwe
Key people
Eng. Noah F. Gwariro - Managing Director,
ProductsElectic Power
OwnerGovernment of Zimbabwe
Websitezpc.co.zw

The Zimbabwe Power Company (ZPC) was formed in October 1996, as part of the 2001 restructuring of Zimbabwe Electricity Supply Authority Holdings, (ZESA) under the Ministry and Energy and Power Development. The Electricity Act (Chapter 13:19) refers. Under the structure, all power generation assets and operations were placed under the Zimbabwe Power Company.

Location/ Contact

12th Floor, Megawatt House, 44 Samora Machel Avenue, Harare, Zimbabwe
Post: P.O Box MP 274 Mount Pleasant, Harare, Zimbabwe
Tel: +263 (0424) 250407-9, 770675, 770672
Fax: +263 (0424) 794828, 702840, 794827, 794820
Email: pr@zpc.co.zw


Current structure

Physical

ZPC runs five power generation plants in Zimbabwe.

Station Design Capacity Production March 2018 Production June 2019
Munyati Thermal Power Station 120MW 0MW 17MW
Bulawayo Thermal Power Station 90MW 0MW 16MW
Harare Thermal Power Station 90MW 14MW 17MW
Hwange Thermal Power Station 920MW 320MW 413MW
Kariba South Power Station 1050MW 725MW 881MW

Ownership

ZPC is owned by ZESA holdings. Each power station holds a generation licence from the Zimbabwe Electricity Regulatory Authority (ZERA).


Projects

  • Lupane Coalbed Methane (Lupane, in western Zimbabwe)
  • Gairezi Hydro-Electric Scheme
  • ZPC Solar (Gwanda, Insukamini, Munyati)
  • Batoka Gorge Hydro-Electric Scheme (Along Zambezi River, downstream of the Victoria Falls)


Corruption Allegations

The Zimbabwe Power Company was alleged to be involved in the Gwanda Solar Project tender award which paid businessman and socialite, Wicknell Chivayo money amounting to $7 million. Irregularities were discovered after the project had not started despite Chivayo being given money. ZPC managing director was reportedly suspended by the board following questions raised by the legislators.

“The total amount that was released was around $7 million, including Value Added Tax; it was disbursed in tranches,” said ZPC board chairman Stanley Kazhanje.

“The amount was paid by management and the figures were within their threshold as it did not require board approval. As a board, we discovered it from Press reports. There was no need for the issue to come to the board.”

[1]


Further Reading

[1] Zimbabwe Power Company website


References

  1. ZESA gave Chivayo $7m, not $5m: Parly, Newsday, Published: 23 January 2018 , Retrieved: 13 March 2018