ZESA Holdings subsidiary, ZETDC has announced that load shedding was entering phase 2 as power generation remains depressed at Hwange. The company attributes this stressed performance to a technical fault at the plant. The notice read:
Kindly note that generation at Hwange is depressed due to a technical fault. Load shedding is now on Stage 2. Load shedding maybe above the publicised schedules. We apologize for any inconveniences caused.
See the tweet below:
https://twitter.com/ZetdcOfficial/status/1132090751456894982
More: ZETDC