Hwange Power Station Output Increases
4 years agoSun, 06 Oct 2019 23:48:22 GMT
![Hwange Power Station Output Increases](/_next/image/?url=https%3A%2F%2Fzero.pindula.co.zw%2Fmedia%2Fnews%2Farticles%2Fhwange-power-station-output-increases.webp&w=640&q=75)
The refurbishment of unit 5 at Hwange Power Station has seen electricity generation increasing to 500 MW up from 300 MW before the exercise, the Chronicle reports. This was revealed in a statement by ZPC which read in part:
Following the refurbishment of unit five at Hwange Power Station, the station is consistently running 5 units at an average of 500 megawatts. Unit six is expected to return to service in December.
Hwange Thermal Power Station has a capacity to produce 920 MW from its 6 units. Currently, unit 6 is down and expected to be functional in 2 months time.
More: The Chronicle
Pindula is best experienced in the Android App
Download here ⬇️:
play.google.com/store/apps/details?id=co.zw.pindula.news